Home › Journal › No. 2266 › Class 42 › NEXTPOWER Priority claimed from 09/09/2025; Application No. : 99/383,592 ;United States of America

NEXTPOWER Priority claimed from 09/09/2025; Application No. : 99/383,592 ;United States of America · application 7410376, class 42

Advertised in Trade Marks Journal No. 2266 on 22 June 2026. Opposition window closes 22 October 2026.

NEXTPOWER Priority claimed from 09/09/2025; Application No. : 99/383,592 ;United States of America

Application
7410376 · filed 19 December 2025 · Delhi office
Class
Class 42: Software, IT and design services
Applicant
Nova Subsidiary Llc (Company, foreign)
Use claimed
Proposed to be used
Advertised
Trade Marks Journal No. 2266, 22 June 2026

Is NEXTPOWER Priority claimed from 09/09/2025; Application No. : 99/383,592 ;United States of America trademarked? Every application under this name →

Goods or services claimed

Inspection, testing, and troubleshooting of utility-scale solar and battery storage systems; design and engineering services of solar energy production facilities, namely, planning, layout, mapping, geographic, surveys, site testing, and foundation, racking and electrical balance of systems design; design of solar photovoltaic systems, namely, design and planning of solar-tracking systems; drafting and development of photovoltaic systems including solar trackers; engineering services in the field of solar-tracking systems; utility solar power plant inspection services, namely, inspection of utility solar power plants via an unmanned teleoperated autonomous land vehicle; detection and reporting of anomalies on utility solar farms identified by an unmanned teleoperated autonomous land vehicle

Opposition window closes 22 October 2026. This mark has passed examination and is advertised so that anyone with an earlier right can object. A notice of opposition (Form TM-O) may be filed until that date; after it, the application proceeds to registration and the mark can only be challenged by rectification. Whether an opposition is worth filing depends on how close the marks are and whether the goods overlap: see how opposition works.

Similar marks in class 42, same issue

Found by the same matcher that powers Brand Watch: identical, contained, near-spellings and sounds-alike names.

What "advertised" means for NEXTPOWER Priority claimed from 09/09/2025; Application No. : 99/383,592 ;United States of America

Advertised is not registered. The Registry examined the application, found no bar (or the applicant overcame the objection), and published it. Registration follows only if no opposition is filed within four months, or if an opposition fails. Until the certificate issues, the applicant may use ™ but not ®. Our guide to trademark status meanings explains each stage, and how long registration takes gives realistic timelines.

Source and corrections. Details are reproduced as advertised by the Registrar of Trade Marks in the Trade Marks Journal (a public record) and may contain errors of transcription. Applicants may ask for a correction or removal of their entry by writing to mehak@trademarkindia.pro. This page is information, not legal advice and not a solicitation.

WhatsApp us