new energylogo mark, read by OCR
Goods or services claimed
Solar panels; fuel cells; inverters; battery packs; battery cases; battery boxes, electric converters; current converters; DC/AC converters; power controllers; electric controllers; electronic controllers; Electric control panels; electronic control panels; touch sensitive control panels and switch panels; sensors; remote monitoring equipments; solar batteries and chargers; solar energy systems; electric wires; power wires; electricity storage apparatus; batteries and electrical connection apparatus for solar energy systems.
What "advertised" means for new energy
Advertised is not registered. The Registry examined the application, found no bar (or the applicant overcame the objection), and published it. Registration follows only if no opposition is filed within four months, or if an opposition fails. Until the certificate issues, the applicant may use ™ but not ®. Our guide to trademark status meanings explains each stage, and how long registration takes gives realistic timelines.
Source and corrections. Details are reproduced as advertised by the Registrar of Trade Marks in the Trade Marks Journal (a public record) and may contain errors of transcription. Applicants may ask for a correction or removal of their entry by writing to mehak@trademarkindia.pro. This page is information, not legal advice and not a solicitation.